25
Nov
Scores of vehicles are stuck on either side of the 15.3-km Dodowa-Afienya road after a heavy three-hour downpour on Saturday, 25 November 2023. The deluge, which started a little before 2pm eventually ceased around 5pm. It rendered the already-horrible and manhole-riddled road totally unmotorable as portions of the road were taken over by river-size puddles of flood waters. All manner of vehicles, including heavyduty trucks, trailers, SUVs and saloon cars have been mud-trapped on either side of the road in front of a giant black house along the road which is about a kilometre from the Ghana Water Company Limited,…